Paving work on Stony Point Rd from Bellevue Ranch Rd to Hearn Ave is scheduled for June 23-27, 2017

posted in: Construction Updates | 0

Working hours from 7:00AM-7:00PM & 7:00PM-7:00AM.

EXPECT FLASHING RED SIGNAL LIGHTS AND FLAGGING CREWS AT HEARN AVE

It will be necessary to restrict parking at various times and locations throughout the duration of the
project. Please look for “No Parking” signs which will be posted a minimum of 72 hours prior to these
activities. These “No Parking” signs will specify the dates and hours of restricted parking. It is critical
that no cars remain parked on the street in posted areas during the indicated times.

Traffic delays should be expected during working hours. There will be traffic and pedestrian handling
procedures in place to minimize any inconveniences that may be caused by construction; however, we
recommend using alternate routes where possible.

All residents will have access to their driveways except for the time that paving is being performed
directly in front of their driveway. Emergency access will always be provided. Please note that garbage
service will continue to be on the regular day; please put your containers out the night before as usual.
All postal services will also continue daily.